Overview
This document provides the optimal reference installation design scheme for cameras, which can assist customers in quickly implementing during the product implementation process.
1. 2D Drawings of Gemini 215
2. Installation and Fixing Methods of Gemini 215
2.1 Option 1. Fix it by using the 1/4-20 UNC hole at the bottom (the hole depth is 5 mm). Torque requirement: 4.0 Nm.
2.2 Option 2. Fix it by using two M3 holes on the back (the hole depth is 3.0 mm). Torque requirement: 0.4 Nm.
[Note]
1. The module needs to be grounded using the 1/4-20 UNC hole.
2. After the module is assembled into the whole device, it must not block the field of view (FOV).